It all started with the first pile, then came another 234 piles. Now it’s time for the solid concrete floor that constitutes the foundation of the largest 3D induction-bending machine in Europe. The hot bending machine now being assembled there will take over where cold bending stops.
The machine is scheduled to be operational after the summer. Afterwards, following all the necessary preparations, induction-bending specialists can start with the induction bending of products used for district heating and the petrochemical industry.